Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom

Download (12.4 kB)
journal contribution
posted on 2018-07-02, 14:06 authored by Pablo Ballesteros-Pérez, Stefán Thor Smith, Josephine Gwen Lloyd-Papworth, Peter Cooke

The impact of (adverse) weather is a common cause of delays, legal claims and economic losses in construction projects. Research has recently been carried out aimed at incorporating the effect of weather in project planning; but these studies have focussed on either a narrow set of weather variables, or a very limited range of construction activities or projects. A method for processing a country’s historical weather data into a set of weather delay maps for some representative standard construction activities is proposed. Namely, sine curves are used to associate daily combinations of weather variables to delay and provide coefficients for expected productivity losses. A complete case study comprising the construction of these maps and the associated sine waves for the UK is presented along with an example of their use in building construction planning. Findings of this study indicate that UK weather extends project durations by an average of 21%. However, using climatological data derived from weather observations when planning could lead to average reductions in project durations of 16%, with proportional reductions in indirect and overhead costs.

Funding

This work was supported by the CIOB Bowen Jenkins Legacy Research Fund under [Grant number BLJ2016/BJL.01]; and NERC with the Environmental Risks to Infrastructure Innovation Programme under [Grant number NE/R008876/1].

History

Usage metrics

    Construction Management and Economics

    Licence

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC